Hi Dirk,

I'm using RED E (version 1.5 from the forum), and you have the Combined Acetabulum and Iliac Peak Force requiring subset T2. However, T2 needs a single time for the event and I'm not convinced that you can specify a time for this calculation: the two forces will peak at different times and all that the calculation does is to add them up, irrespective of when they occur. I think it should be T1 instead (analysis start and end times only).
Paul.
DiVe
Posts: 411
Joined: Tue Apr 24, 2007 9:14 am
Company: IAT mbh
Location: IAT Berlin - Germany
Contact:

Re: Combined Acetabulum and Iliac Peak Force in RED E

Post by DiVe »

Hi Paul,

you first have to add the two channels and then determine the maximum of the sum channel.

Please find the explanation of IIHS for total pelvic force attached.

Bye
Dirk
Sum of pelvic Forces IIHS_protocol_side.pdf
(22.18 KiB) Downloaded 812 times
User avatar
Paul Wellicome
Posts: 176
Joined: Mon Apr 23, 2007 2:20 pm
Company: HORIBA MIRA Ltd
Location: HORIBA MIRA Ltd, England

Re: Combined Acetabulum and Iliac Peak Force in RED E

Post by Paul Wellicome »

OK, thanks.
DiVe
Posts: 411
Joined: Tue Apr 24, 2007 9:14 am
Company: IAT mbh
Location: IAT Berlin - Germany
Contact:

Re: Combined Acetabulum and Iliac Peak Force in RED E

Post by DiVe »

Item closed.